[sales_countdown_timer id="salescountdowntimer"]

Auradine Teraflux AT2880 – Air Cooled

The Auradine Teraflux AT2880 is a high-performance ASIC miner built for the SHA-256 algorithm, making it compatible with a wide range of cryptocurrencies including Bitcoin (BTC), Bitcoin Cash (BCH), Deutsche eMark (DEM), DGB-SHA (DGB), Fractal Bitcoin (FB), KingPepe (KPEPE), Novo (NOVO), Peercoin (PPC), Radiant (RXD), Unobtanium (UNO), eCash (XEC), and Myriad-SHA (XMY). It comes in two versions: the Standard model delivers a maximum hashrate of 180 TH/s at 1200 W, while the Turbo model reaches 260 TH/s at 1400 W. Both versions achieve an impressive energy efficiency of 0.117 J/GH, making the AT2880 a powerful and efficient solution for SHA-256 mining.

Very Fast Shipping
All Machine Include PSU
Online Support 24/7
High Quality Products
Secure Payment

Description

The Auradine Teraflux AT2880 – Immersion Cooled miner is available in two configurations: Standard and Turbo. The Standard model delivers a hash rate of 180 TH/s with a power consumption of 1200 W, resulting in an energy efficiency of approximately 8.0 J/TH. The Turbo variant offers a higher hash rate of 260 TH/s while consuming 1400 W, achieving an energy efficiency of about 6.7 J/TH. Both models are designed to operate within a temperature range of 5°C to 45°C, ensuring reliable performance under various environmental conditions.

Manufacturer auradine teraflux
Model AT2880 – Air Cooled
Hashrate Normal : 180 th/s –  Turbo : 260 th/s
Release 2025
Size 292.5mm*171.5mm*281mm
Weight 17500g
Noise level 60dB
AI support Smart efficiency management
Power Normal : 1200W – Turbo : 1400W
Voltage 100–250V AC
Interface Ethernet
Temperature 5 – 50 °C
Humidity 5% – 95%

Please note that the shipping process occurs on a specified date predetermined in advance. We gather orders for a duration of 10 days and designate a day for shipping all orders collectively. This date is indicated on the website, marking the commencement of shipping operations for the current batch. Therefore, please consider bank transfer payments, as they may take 6 to 7 business days. Thus, customers need to submit their orders within 3 days of opening orders for the current batch to enable us to receive and confirm their payment and start shipping their order on the specified date. In case customers’ payments are delayed, and we are unable to ship their order in the current batch due to delayed bank transfers, their order will be automatically deferred to the next batch, and they will be notified accordingly in their account. For further information, please refer to the FAQ section.